WHAT IS THIS CONTRACT FOR? This contract is for landfill on-call environmental consulting and operation and maintenance services at the City's three landfills (Sudbury Road, Tausick Way, and Isaacs Inert Waste). Previously this work was provided by two separate contracts – one for on-call environmental and a separate one for landfill gas and leachate collection system operations and maintenance. Consolidating services into a single contract simplifies administration and unifies environmental control, management, and reporting. Services include, but are not limited to: • Landfill environmental consulting (on-call as/when needed) • Regulatory compliance monitoring and data review (including sampling and testing) for air, groundwater, landfill gas, and leachate • Regulatory reporting and coordination • Maintenance of the groundwater monitoring well infrastructure • Environmental permitting assistance (on-call as/when needed) • Landfill gas collection and flare operations and maintenance • Leachate collection system operation and maintenance WHY DO WE NEED TO HIRE A CONSULTANT? This is specialized work in landfill engineering, groundwater monitoring, and landfill control systems. Landfill gas (mainly methane) is corrosive, explosive, and is very hard on gas system sensors. These gas systems require considerable maintenance and technical knowledge to keep them operational. Leachate collection systems are similar in that they deal with a corrosive and toxic substance. Groundwater monitoring and reporting is required to be conducted by a licensed geologist or by a professional engineer with the appropriate background in groundwater. City staff does not have the expertise required to perform this work. Due to the complexity and specialized technical nature of this work, the City has historically contracted out this work to firms possessing the technical expertise and training. IS THE COST REASONABLE? The not to exceed cost of $349,020 per year was negotiated by staff with Geosyntec Consultants. The cost of this work was compared against past groundwater monitoring, environmental consulting, and operation and maintenance contracts for similar work and found to be consistent, fair, and reasonable. Below are the fees for these contracts for the past 3 years: Year Annual Contract Actuals 2022 $284,278.00 $249,124.45 2023 $329,840.00 $299,294.05 2024 $355,695.00 $232,250.48 CONSULTANT SELECTION DETAILS: A request for qualifications was issued on March 13, 2025. Three (3) statements of qualifications were received and reviewed by City staff. Geosyntec Consultants was selected as the most qualified firm to perform the work. HISTORY: Sudbury Road Landfill: The Sudbury Road Landfill (SRL) operates in accordance with the standards of Chapter 173-351 Washington Administrative Code (WAC), Criteria for Municipal Solid Waste Landfills, and a Municipal Solid Waste Landfill permit issued by the Walla Walla County Department of Community Health (WWCDCH). Both require groundwater monitoring at the facility. In 2005, the City constructed Area 7 for waste disposal at the SRL. This landfill area includes a liner and leachate collection system that contains and collects the leachate (any liquid that is created when garbage breaks down or when stormwater comes into contact with garbage). Leachate is collected at the bottom of the landfill and pumped to a leachate evaporation pond. The leachate collection system consists of piping that must be periodically leak-tested and pumps that must be properly maintained to ensure that leachate does not collect at the bottom of the landfill. As the SRL waste disposal areas are expanded, the leachate collection system will also expand and become more complex. In 2010, the City closed Area 6 at the SRL. Closure included installation of a landfill gas collection system, flow meter, and flare for the collection and destruction of landfill gas. This system became operational in January 2011 and in 2016, the landfill gas collection system was expanded to include Area 1, Area 2, and Area 5. There are a total of 23 vertical gas extraction wells and two leachate cleanout wells. Landfill gas is a very potent greenhouse gas and, as a result, it is destroyed before entering the atmosphere by flaring (burning) the gas at extremely high temperatures (approximately 1,500 degrees Fahrenheit). The Department of Ecology issued an air permit for the SRL which requires the continuous operation of the landfill flare. Tausick Way Landfill: The Tausick Way Landfill (TWL) is a closed municipal solid waste landfill that covers approximately 78 acres. The TWL operated from 1935 until 1978 (approximate dates) as both City and County municipal solid waste disposal facilities. Since closure, private development has occurred on the northern and western landfill boundaries of the TWL. These developments include apartment units, retail stores, and storage units. A landfill gas monitoring system has been constructed to monitor methane levels within the landfill boundaries and at many of the developments adjacent to the landfill. Five landfill gas monitoring wells are located on the landfill property and 18 monitoring points have been established adjacent to the landfill. Landfall gas monitoring is conducted to assess gas levels on the landfill property and to assess possible off-site migration of landfill gas to adjacent properties. An annual report is prepared by the consultant that summarizes the landfill gas sampling and monitoring results. Future needs for this site may include groundwater and landfill gas evaluations, report preparation, remediation investigations, and communications with the City and regulatory agencies. Isaacs Inert Waste Landfill: The Isaacs Inert Waste Landfill (IIWL), also known as the Burdine Landfill, is a closed inert waste landfill that covers approximately 14 acres. The site was permitted for disposal of inert waste fill (concrete, asphalt, dirt, etc.) by the previous owner in the 1990s. The City purchased the property in 1999 from the bank after the former owner declared bankruptcy. In February 2004, the Ecology Toxics Cleanup Program submitted an Early Notice Letter to the City indicating that Ecology had received reports from the bank that solid waste and contaminated soil had been discovered on the property. As a remedial action, the City proposed to construct a cover over the municipal solid waste using inert waste. A Solid Waste Permit Application was submitted to the WWCDCH on August 1, 2006, and an inert waste landfill permit was granted in accordance with WAC 173-350 by the WWCDCH on August 30, 2006. In 2021, the landfill was filled to capacity and the solid waste permit was closed. The City is still responsible for maintaining the site. Six groundwater and three landfill gas wells are located on the property. The groundwater wells were sampled during preliminary studies, but have not been sampled since 2017. The landfill gas wells are monitored quarterly by City staff. Future needs for this site may include groundwater and landfill gas evaluations, report preparation, remediation investigations, evaluation of potential developments on site, acquisition of grant funding, and communications with the City and regulatory agencies. |